209k views
4 votes
A machine in a candy factory produces 5 and 1/2 batches of milk balls every 3/4 hour. Which of the following is the unit rate for producing the milk balls, in batches per hour?

a
4 and 1/8 : 1
b
5 and 3/4 : 1
c
6 and 1/4 : 1
d
7 and 1/3 : 1

1 Answer

5 votes
5.5 milk balls : 0.75 hour
X : 1 hour
0.75x = (1)(5.5)
x = 7.333

So it’s 7and 1/3 in 1 hour
Answer d
User Luis Cazares
by
4.9k points