Answer:
D. Variable overhead is a relatively small part of total overhead.
Step-by-step explanation:
The variable overhead of the cost behavior would become more difficult for estimation as compared with the behavior of direct materials or direct labor for all the given reasons but it should not be valid for the variable overhead that contains small part of the total overhead
Therefore according to the given situation, the option D is correct