Answer:
Overapplied overhead= $21,802
Step-by-step explanation:
First, we need to calculate the predetermined overhead rate:
Predetermined manufacturing overhead rate= total estimated overhead costs for the period/ total amount of allocation base
Predetermined manufacturing overhead rate= 469,930 / 46,993
Predetermined manufacturing overhead rate= $10 per direct labor hour
Now, we can allocate overhead:
Allocated MOH= Estimated manufacturing overhead rate* Actual amount of allocation base
Allocated MOH= 10*54,505
Allocated MOH= $545,050
Finally, the over/under allocation:
Under/over applied overhead= real overhead - allocated overhead
Under/over applied overhead= 523,248 - 545,050
Overapplied overhead= $21,802