Answer:
0.93 days
Step-by-step explanation:
Number of employees ( m ) = 3
Average production time of a bag ( p ) = 2.2 days
standard deviation ( std ) = 3 days
Number of customer order expected per day = 1
Coefficient of interarrival times of order ( c ) = 1
arrival time ( a ) = 1
Determine the expected duration between when a n order is received and when production begins on the bag
determine the utilization time = p / ( m*a ) = 2.2 / ( 3 * 1 ) = 0.733
Hence the expected time :
Tq = 0.93 days
attached below is the detailed solution