A construction company pours concrete at a constant rate to make a sidewalk. There are 1,054 cubic feet of concrete available, and 6.2 cubic feet of concrete is poured each minute. The equation below shows the total volume, in cubic feet, of concrete remaining minutes after the construction company begins to pour the concrete.