Answer:
$270,000
Step-by-step explanation:
Calculation of total manufacturing cost assigned to Job 436
Direct Materials
Dept A $50,000
Dept B $10,000
Direct Labor
Dept A ($80,000 x 1/2) $40,000
Dept B $60,000
Manufacturing Overheads
Dept A $80,000
Dept B ($60,000 x 50%) $30,000
Total $270,000
Therefore,
The total manufacturing cost assigned to Job 436 was $270,000.