160k views
3 votes
Monroe Corporation manufactures modern and antique clocks. Monroe's total overhead costs consist of assembly costs and inspection costs. The following information is available: Cost Antique Modern Total Cost Assembly 3,600 mach. hours 1,200 mach. hours $168,000 Inspections 600 200 $80,000 4,500 labor hours 4,000 labor hours Monroe is considering switching from one overhead rate based on labor hours to activity-based costing. Using activity-based costing, how much of the assembly cost is assigned to the modern clocks

User AlixB
by
5.5k points

1 Answer

3 votes

Answer: $42,000

Step-by-step explanation:

The total cost of Assembly is $168,000.

This is for the machine hours spent on both Antique and Modern clocks of:

= 3,600 + 1,200

= 4,800 hours

Modern clocks assembly costs would be:

= Modern clock machine hours / Total machine hours on assembly * Cost of assembly

= 1,200 / 4,800 * 168,000

= $42,000

User Greg Grater
by
4.8k points