157k views
4 votes
At an activity level of 8,400 machine-hours in a month, Falks Corporation’s total variable production engineering cost is $732,480 and its total fixed production engineering cost is $180,400. What would be the total production engineering cost per machine-hour, both fixed and variable, at an activity level of 8,800 machine-hours in a month? Assume that this level of activity is within the relevant range.

1 Answer

2 votes

Answer:

The right response is "$107.7".

Step-by-step explanation:

The given values are:

Total variable production eng. cost

= $732,480

Total fixed production eng. cost

= $180,400

Now,

Variable cost per machine hour will be:

=
(732,480)/(8,400)

=
87.2 ($)

Fixed cost per unit will be:

=
(180,400)/(8,800)

=
20.5 ($)

hence,

Total production cost will be:

=
Total \ variable \ production \ eng. \ cost+Fixed \ cost

On substituting the values, we get

=
87.2+20.5

=
107.7 ($)

User Vava
by
3.7k points