94.0k views
0 votes
Pls help

How much work is done when a bucket of mass 2kg with 20kg
of water in it is pulled up from the bottom of a well 10m deep?​

User Mininoz
by
4.0k points

1 Answer

2 votes

Answer:

2156 J

Step-by-step explanation:

From the question,

Work done = Combined mass of the bucket and water×height×gravity.

W = (M+m)hg............................. Equation 1

Where M = mass of water, m = mass of the bucket, h = height, g = acceleration due to gravity.

Given: M = 20 kg, m = 2 kg, h = 10 m

Constant: g = 9.8 m/s²

Substitute these value into equation 1

W = (20+2)×10×9.8

W = 22×98

W = 2156 J

User Christoph Sommer
by
5.0k points