273,778 views
2 votes
2 votes
A construction company spends w weeks extending an existing road. The existing road is 5 miles long. Each week the company completes 0.2 miles of the extension. Which equation models the total length (L) of the road?

A. L = 0.2w + 5
B. L = 0.2w - 5
C. w = 0.2L + 5
D. w = 0.2L - 5

User Kagaratsch
by
2.9k points

2 Answers

20 votes
20 votes
The answer would be A
User Ohadpr
by
2.8k points
8 votes
8 votes

Answer:

A. L=0.2w+5

Hope this helps!!! :)

User Akanksha Gaur
by
3.2k points