Answer:
The number of FTE needed to be hired to cover the additional procedures per 7.5 day work is:
= 1.
Explanation:
a) Data and Calculations:
Endoscopies EP Studies Total
Projected number of studies 60 5 65
Time in minutes for per study 5 15
Total time required (in minutes) 300 75 375
Full-time Employee (FTE) works 7.5-hour day or 450 minutes (7.5 * 60) per day.
b)The number of full-time employees (FTE) needed to be hired to cover the additional procedures per 7.5-day work is 1. The FTE has 450 minutes available for the additional procedures. She will only require 375 minutes. Therefore, she has extra (idle) time of 75 (450 - 375) minutes per workday.