4man = 30hrs
1man = 30/4
1man = 7.5hrs
5man = 30-7.5 = 22.5
6man = 22.5-7.5 = 15
7man = 15-7.5 = 7.5
If 7 man did the job,they would need 7.5 hours or 7 hours and 30 mins.