When making a value-based criteria
table, if a certain criteria is more
important to you than the others,
what should you do?
A. Assign a value to that criteria that is higher
than the others.
B. Have all of the criteria weighted with the
same value.
C. Assign a value to that criteria that is lower
than the others.