76.1k views
1 vote
A job is done slowly, and an identical job is done quickly. Both jobs require the same amount of.... but different amounts of...

User Jpenzer
by
3.4k points

1 Answer

4 votes

Answer:

work, power

Step-by-step explanation:

Work = Fnet x distance

Work is NOT dependent on time

Power = Work ÷ time

The slower the work is done, the higher the power. The faster the same amount of work is done, the lower the power. Power, with work constant, is inversely proportional to time.

User Yaku
by
3.5k points