178k views
4 votes
Ryan can paint one wall in three hours, and Donovan can paint

two walls in four hours. How long would it take them to paint
three walls if they work together?
a 4.1 hours
b 3.2 hours
c 3.6 hours
d 2.8 hours

User Jlrolin
by
6.8k points

1 Answer

5 votes

Answer:

I think its answer b for sure

User Gary Lindahl
by
6.8k points