197k views
3 votes
then prepare the report to inform mr. young on the overall status of the ventura project in terms of costs and schedule. your report must be professionally written, demonstrate clear analysis of the data contained on pg 520, andbe relevant to costs and schedule for the project.

User Erving
by
5.1k points

1 Answer

3 votes

Answer:

The venture is running over a spending plan since BAC (Budget at fruition) ought to have been 310,000,000 anyway the Estimate at consummation a conjecture

User UnstableFractal
by
5.7k points