Answer:
1. Anne notices that the construction company isn't properly following the specified layout for emergency exits
3. Michiko reviews the latest spec changes from the architect on her project and realizes that a simple color change is going to require reordering massive amounts of tile and slow constriction to a halt
Step-by-step explanation:
Problem sensitivity simply means the ability for someone to be able to know that something is wrong with a particular thing. In this case, the civil engineer demonstrating problem sensitivity include:
1. Anne notices that the construction company isn't properly following the specified layout for emergency exits
3. Michiko reviews the latest spec changes from the architect on her project and realizes that a simple color change is going to require reordering massive amounts of tile and slow constriction to a halt .
In both cases, they detected what was wrong and could hinder what they were doing or can cause a problem later.
Problem sensitivity simply means the ability for someone to be able to know that something is wrong with a particular thing.