We have that the first 40h are paid at $28.30 each hour, so this first 40h give $1132
![28.30\cdot40=1132](https://img.qammunity.org/2023/formulas/mathematics/college/anqs2flfapnvk952q8sdtwttlwa3g47xoo.png)
Now the other 5.25 hours that are beyond 40h the last week are paid at the double of a normal hour this means are paid at $56.60 ($28.30 x 2). Now the 5.25h give 297.15
![56.60\cdot5.25=297.15](https://img.qammunity.org/2023/formulas/mathematics/college/g4rbygf5ttkwxn9uazeuo8z2tpt2wsw37o.png)
So the total is $1429,15. The answer is $1429,15