Answer: 0.1 units per minute
Step-by-step explanation:
Step 1 time = 10 minutes per unit
Step 2 time = 6 minutes + (0.4 * 6 minutes for those units reworked)
= 8.4 minutes
Step 3 time = 7 minutes + (0.4 * 7 minutes for those units reworked)
= 9.8 minutes
Step 1 will determine the process capacity because it is the one that takes the most time and therefore is the bottleneck process.
Capacity of process = 1 / Bottleneck minutes
= 1 / 10
= 0.1 units per minute