134k views
4 votes
Calculate the unit rate for Machine A and Machine B. Determine which is the greater rate.Machine A covers 5/8 square feet in 1/2 hour or Machine B covers 2/3 square feet in 1/3 hour.

User Bfieck
by
3.2k points

1 Answer

0 votes

Given:

Machine A covers 5/8 square feet in 1/2 hour.

Machine B covers 2/3 square feet in 1/3 hour.

Solution:

The unit rate of the machine A will be as


\begin{gathered} \text{Unit Rate=}((5)/(8))/((1)/(2)) \\ =(5)/(8)\ast(2)/(1) \\ =(10)/(8) \\ =1.25 \end{gathered}

The unit rate of the machine B will be as


\begin{gathered} \text{Unit Rate=}((2)/(3))/((1)/(3)) \\ =(2)/(3)\ast(3)/(1) \\ =2 \end{gathered}

Answer:

Hence, the unit rate of the machine B is greater.

User Argy
by
2.8k points