To determine the grade we first need to find the slope of the track, the slope is given by:

In this case, we know that the track rise 7 ft in a 300 ft run, then we have:

Now that we know the slope we just multiply it by 100 to find the grade:

Hence the grade of the track is 2.3% and since this is less than 3.6% we conclude that this track meets the rapid-transit rail standards