First, let's calculate the volume of dirt that would have to be removed to dig the foundation.
Therefore, 50 cubic yards would have to be removed in order to dig the foundation.
Now, let's use a rule of three to calculate the loads needed to move such volume of dirt:
This way,
10 loads would be needed.
To calculate the total cost, multiply the cost per load by the number of loads:
Therefore, it would cost the contractor $200 to get all the dirt hauled away