For the first method the fix cost is $ 15,113 and the variable cost is $ 22/book.
For the second method the fix cost is $ 63,848 and the variable cost is $ 10.75/book.
Let the number of books be x for which the cost from the two methods is same,
Thus, the required number of books is 4332.