In order to aerate and laser-grade a baseball field, a contractor charges $350, plus $25 per hour for a job. The equation c=25h+350 describes the cost, c for a job that takes h hours.
a. Rewrite the equation to isolate h.
b. If a job costs $950, how many hours did it take?
we have the equation
c=25h+350
Solve for h------> that means, isolate the variable h
subtract 350 both sides
c-350=25h+350-350
(c-350)=25h
Divide by 25 both sides
(c-350)/25=h
h=(c-350)/25
Part 2
h=(c-350)/25
For c=$950
substitute
h=(850-350)/25
h=500/25
h=20 hours