Answer
(12s + 15)
Step-by-step explanation
We are told that the number of meters of cable needed for the elevator is 12 times the number of stories in the building plus an extra 15 meters needed to go into the machinery.
If a building has s stories,
The number of meters of cable required will be
(s × 12) + 15 = (12s + 15) meters
Hope this Helps!!!