102,127 views
21 votes
21 votes
Litton Company estimates that the factory overhead for the following year will be $1,250,000. The company has decided that the basis for applying factory overhead should be machine hours, which is estimated to be 40,000 hours. The machine hours for the month of April for all of the jobs were 4,780. If the actual factory overhead totaled $141,800, determine the over- or underapplied amount for the month.

User Blurfus
by
3.1k points

1 Answer

7 votes
7 votes

Answer:

Overapplied overhead= $7,575

Step-by-step explanation:

First, we need to calculate the predetermined overhead rate:

Predetermined manufacturing overhead rate= total estimated overhead costs for the period/ total amount of allocation base

Predetermined manufacturing overhead rate= 1,250,000 / 40,000

Predetermined manufacturing overhead rate= $31.25 per machine hour

Now, we can allocate overhead:

Allocated MOH= Estimated manufacturing overhead rate* Actual amount of allocation base

Allocated MOH= 31.25*4,780

Allocated MOH= $149,375

Finally, the over/under allocation:

Under/over applied overhead= real overhead - allocated overhead

Under/over applied overhead= 141,800 - 149,375

Overapplied overhead= $7,575

User Mehdzor
by
2.6k points