We have to write the conthitions that are given to us so:
1) 8 small (S) and 6 large (L) finish in one day so we can write it like:

2) a small (S) takes 4 days more than a large (L) one to do the same work so we can put it like:

we solve the secon one for x so:

then we can make the equation equal:

we can replace this expretion into the first equation to know how long it would take to do it just with small trucks so:

and we solve for S so:

this means that 14 small trucks would take 25 days to finish the work so now we can made a rule of 3 to find the tame that takes to just one truck so:

it would take 350 days to finis the work for one small truck