Answer:
Machine setups= $173.8 per setup
Special processing= $136.67 per machine hour
General factory= $13 per direct labor hour
Step-by-step explanation:
To calculate the activities cost rates, we need to use the following formulas:
Predetermined manufacturing overhead rate= total estimated overhead costs for the period/ total amount of allocation base
Machine setups= 34,760 / 200= $173.8 per setup
Special processing= 136,670 / 1,000= $136.67 per machine hour
General factory= 819,000 / 63,000= $13 per direct labor hour