34.8k views
1 vote
How many of road does the crew need to pave?

How many of road does the crew need to pave?-example-1

1 Answer

1 vote

We have a function that relates the length L left to be paved in function of d, the number of days:


L(d)=202-8d

a) We can calculate this as L(13), as d = 13:


\begin{gathered} L(13)=202-8(13) \\ L(13)=202-104 \\ L(13)=98 \end{gathered}

After 13 days, 98 miles are left to pave.

b) If 130 milesis left to be paved, we have L = 130.

We can calculate d as:


\begin{gathered} L(d)=130 \\ 202-8d=130 \\ 202-130=8d \\ 72=8d \\ d=(72)/(8) \\ d=9 \end{gathered}

Answer:

a) 98 miles.

b) 9 days.

User Floriank
by
3.5k points