Using the z-score formula as shown below

Calculate the z-score range from 380 miles to 420miles

The probability for the range will be
[tex]\begin{gathered} Pr(z_1 The probability that a new vehicle off the assembly has a battery range will be between 380 and 420, will be[tex]\begin{gathered} Pr(-1.0
Hence, the probability that a new vehicle off the assembly has a battery range will be between 380 and 420 is 0.68Option A is the right answer