132k views
4 votes
Engineers are digging a 3200-foot-long tunnel at a constant rate. After 5 months, the engineers still need to dig 1700 feet to finish the project. How much time does it take to complete the tunnel from start to finish?

User JOTN
by
3.5k points

1 Answer

1 vote

length od the tunnel = 3200 ft

after 5 months they need to dig 1700 ft more.

First, calculate the ft dug

3200-1700 = 1500 ft

Apply the rate

ft / time

1500 / 5

For the total length:

3200/ t

Equal both rates:

1500/5 = 3200/t

t = 3200 / (1500/5)

t= 3200/ 300

t= 10.6 months

User Asportnoy
by
3.0k points