108k views
5 votes
I need help with this problem:Conveyor belt 16 inches wide is moving boxes that are 8 inches wide and 12 inches long. Using the full width of the belt, how fast, and feet per minute, with the belt need to move in order to upload 9600 boxes in an hour?

1 Answer

3 votes

ok

Let's think the the convetor is carrying the boxes by their width, so there are

16/8 = 2 boxes

speed = boxes / hour

speed = length / time

length = 96x1

length = 96 in

1 box --------------------- 8 in

x -------------------- 96 in

x = 96/8

x = 12 boxes

Then, in 1 hour it can carry 12 boxes

But it needs to carry 96 boxes

12 boxes -------------------- 1 hour

96 boxes ------------------- x