The cost of the instalation can be found by adding the fixed fee of 675 to the cost per feet multiplied by the length of the perimeter. We have:

Where x is the length of the perimeter. In this case the perimeter is 120 feet. And the cost was $2,475.

The cost is $15 per foot.