Let:
x = Number of road bikes
y = Number of town Cruisers
A maximum of 60 hours a week is set aside to complete the essay for both types of bike
so:
After assembly for safety reasons the assembly needs to be checked and tested it takes 1/2 hour to check and test the road bikes in 1/4 hour to check and test the time Cruisers a maximum of 20 hours per week is set aside to complete these tasks for both types of bike, so:
Therefore, the system is given by: