55.2k views
2 votes
The electronics company makes two types of switches. Type a takes 4 minutes to make and requires $3 worth of materials.Type b takes 5 minutes to make and requires $5 of materials. In the latest production bath, it took 32 hours to make these switches and the materials cost 1740. How many of each type of switch was made?

1 Answer

1 vote



Let

x ------> number of switch type A

y -----> number of switch type B

so

Remember that

1 hour=60 min

32 hours=32*60=1,920 minutes

4x+5y=1,920 -------> equation 1

3x+5y=1,740 ------> equation 2

Solve the system of equations

Solve by graphing

using a graphing tool

see the attached figure

Solution is

x=180

y=240

therefore

the number of switch type A was 180

the number of switch type B was 240

The electronics company makes two types of switches. Type a takes 4 minutes to make-example-1
User Scottie T
by
4.1k points