183k views
4 votes
this pool measures 7m long by 4m wide and is 1.2 m deep when full. To fill the pool, a hose delivers 20 L per minute is placed in the pool. how long will it take to fill the pool to its proper depth, starting from empty?​

User Mfuchs
by
7.6k points

2 Answers

3 votes

Answer:

We need to find the volume first.

We will use our famous volume of a rectangular solid formula:

V = l x w x h

So, V = 12 x 7 x 1.2 = 100.8 cubic meters.

Now, cost = 100.8 x 27.25 = 2746.8 PHP

Conclusion:The water will cost PHP 2,746.8.

User Evil Andy
by
8.1k points
4 votes

Answer: 28 hours

Explanation:


V=7(4)(1.2)\\\\v=33.6\ m^3


\displaystyle\\20\ l/min=\\\\(20(60))/(1000) =\\\\(1200)/(1000)=\\\\1.2\ m^3/hour


\displaystyle\\v=(V)/(t) \\

Multiply both parts of the equation by t(t≠0):


vt=V

Divide both parts of the equation by v (v≠0):


\displaystyle\\t=(V)/(v) \\\\t=(33.6)/(1.2) \\\\t=28 \ hours

User Rafay Khan
by
7.6k points

No related questions found

Welcome to QAmmunity.org, where you can ask questions and receive answers from other members of our community.

9.4m questions

12.2m answers

Categories