Explanation:
we could do something like "reverse engineering". starting with the planned outcome we calculate backwards.
she had to speak at 10:45 am
she needs to walk 5 minutes from the station : start latest at 10:40 am
the train journey takes 1 hour 10 minutes. start latest at 9:30 am. since the trains leave at 25 minutes past the hour (and not at 30 minutes past the hour), she needs to take latest the 9:25 train.
it takes her 1 hour to get to the train stain : start latest at 8:25 am.
she needs to leave home latest at 8:25 am