Final answer:
The budgeted variable costs for High Point Clinic in 2019 are calculated by adding the total labor costs and supply costs together, which results in $900,000.
Step-by-step explanation:
To calculate the budgeted variable costs for High Point Clinic in 2019, we consider both labor and supply costs associated with the projected 50,000 visits. First, we need to calculate the total labor cost by multiplying the number of visits (50,000) by the hours of labor per visit (0.5 hours) and then by the cost of labor per hour ($30). This calculation gives us $750,000. Next, we calculate the supply cost by multiplying the number of visits (50,000) by the units of supplies needed per visit (1.5 units) and then by the cost per unit of supply ($2), resulting in $150,000. These two figures are then added together to give the total budgeted variable costs for 2019.
Total labor cost = 50,000 visits × 0.5 hours/visit × $30/hour = $750,000
Total supply cost = 50,000 visits × 1.5 units/visit × $2/unit = $150,000
Budgeted variable costs = Total labor cost + Total supply cost
Budgeted variable costs = $750,000 + $150,000 = $900,000