A front end loader needed to apply 200N of force to lift a rock. A total of 275J of work was done. How high was the rock lifted?​

User Tdon
by
7.4k points

1 Answer

4 votes

Answer:

1.375 m

Explanation:

W=F.h

So, h =275/200

= 11/8 m

= 1.375 m