192k views
5 votes
A carpenter needs 7.8 feet of rope for a project. How much will the carpenter spend if the rope costs $3.98 per foot? PLEASE SHOW WORK

User ViG
by
5.7k points

1 Answer

5 votes

7.8×3.98= 31.04 is the correct answer

User Gerrit Brink
by
5.1k points