359,832 views
25 votes
25 votes
Job order costing can be applied or used at the same time with

a. actual costing system

b. normal costing system

c. both a and b

d. none of the above

User Rodrigo Lopez
by
2.6k points

1 Answer

25 votes
25 votes
D. None of the above
User Michael Veale
by
2.6k points