A construction crew has just built a new road. It took them 8 weeks to build 10.24 kilometers of road. At what rate did they build the road?

User Samar
by
8.0k points

1 Answer

3 votes

Answer:

Are you trying to figure out how long the road is?

10.24 km per week, times 4 weeks.

10.24 x 4 = 40.96