230k views
2 votes
The company produced 4,000 units of P59G. Direct materials cost $7.30 per unit and direct labor costs $5.45 per unit. How much overhead cost would be allocated to Product P59G using activity-based costing

1 Answer

3 votes

Step-by-step explanation:

Ggxhhgxhxgchhxigciyytf is a great tool for a beginner and a beginner to 30 and the beanstalk movie has a lot of fun with it and it is very a very great place to play for free a little time and time consuming to do it to make the most of most enjoyment for the shipment to the highest possible price and

User Centralcmd
by
3.7k points