Deviations from the engineering drawing cannot be made without the approval of the

A. contractor
B. architect
C. engineer
.D. foreman

User Jmnwong
by
2.8k points

2 Answers

6 votes
6 votes

Answer:

it's option a. contractor

Step-by-step explanation:

did the same quiz

User Mykola Borysyuk
by
2.8k points
19 votes
19 votes

Answer:

a. contractor

Step-by-step explanation:

The contractor has to approve or give the sign for the drawings to be made, otherwise you can't do anything.