A construction company can remove 1/4 metric tons of dirt from a construction site in 1/6 hours what is the unit rate in metric tons per hour?

User Meks
by
8.1k points

1 Answer

1 vote

Answer:

2/3 metric tons per hour

Explanation:

unit rate in metric tons per hour= metric ton/ time( hrs)

= 1/4 metric tons/1/6 hours

= 1/4 ×6/1

=4/6 metric tons per hour

= 2/3 metric tons per hour