menu
Qammunity
Login
Register
My account
Edit my Profile
Private messages
My favorites
Ask a Question
Questions
Unanswered
Tags
Categories
Ask a Question
Evaluate mº - n2 for m = 2 and n = -1.
asked
Apr 26, 2022
102k
views
0
votes
Evaluate mº - n2 for m = 2 and n = -1.
Mathematics
college
Annemichelle
asked
by
Annemichelle
7.9k
points
answer
comment
share this
share
0 Comments
Please
log in
or
register
to add a comment.
Please
log in
or
register
to answer this question.
1
Answer
6
votes
Answer:
Explanation:
Yeison
answered
Apr 30, 2022
by
Yeison
8.5k
points
ask related question
comment
share this
0 Comments
Please
log in
or
register
to add a comment.
← Prev Question
Next Question →
Related questions
asked
Dec 9, 2024
205k
views
What is the length of the side of a square field whose perimeter is 72 mº.
Jason Kincl
asked
Dec 9, 2024
by
Jason Kincl
7.8k
points
Mathematics
high-school
1
answer
1
vote
205k
views
asked
Feb 5, 2024
210k
views
A student was investigating heat transfer rate for a particular thermal system. In this system, Water at a volumetric flow rate of 0.05 mº/s flows through a smooth tube of 5 cm diameter. It is heated from
David Hobs
asked
Feb 5, 2024
by
David Hobs
8.6k
points
Engineering
college
1
answer
1
vote
210k
views
asked
Jan 15, 2024
136k
views
A 6 m wall retains a dry sand backfill with a unit weight of 19 kN/mº, specific gravity (G) 2.65, an angle of internal friction of 35° and a porosity of 31%. The backfill is fully drained through weep
Nirav
asked
Jan 15, 2024
by
Nirav
8.3k
points
Physics
high-school
1
answer
0
votes
136k
views
Ask a Question
Welcome to QAmmunity.org, where you can ask questions and receive answers from other members of our community.
9.4m
questions
12.2m
answers
Other Questions
How do you can you solve this problem 37 + y = 87; y =
What is .725 as a fraction
How do you estimate of 4 5/8 X 1/3
A bathtub is being filled with water. After 3 minutes 4/5 of the tub is full. Assuming the rate is constant, how much longer will it take to fill the tub?
i have a field 60m long and 110 wide going to be paved i ordered 660000000cm cubed of cement how thick must the cement be to cover field
Twitter
WhatsApp
Facebook
Reddit
LinkedIn
Email
Link Copied!
Copy
Search Qammunity