Answer:
the sand and cement needed is 7.5 kg and 4.5 kg respectively
Explanation:
The computation of the sand and cement needed is shown below:
Given that
The mix of sand and cement is 5kg and 3kg i.e. its ratio is 5:3
And there is a 12kg of mix of both things
So individually it required
For sand = 12 × 5 ÷ 8
= 7.5 kg
For cement = 12 × 3 ÷ 8
= 4.5 kg
Hence, the sand and cement needed is 7.5 kg and 4.5 kg respectively