Answer:
(a) value-added time is 36minutes
(b) inspection time is 12 minutes
(c) move time is 10 minnutes
(d) wait time is 10 minutes
(e) cycle time is 58 minutes
Step-by-step explanation:
The value added time is actually the processing time on the product.
Value added time = Cutting and sewing processing + Ironing T-shirts + Packaging T-shirts
Value added time = 18 min + 8 min + 10 min
Value added time = 36 minutes
(b)
Inspection time is the time incurred to inspect the quality of the product.
Incpection time = Quality inspection = 12 min
(c)
Move Time is the time incurred to move the item from one place to another
Move Time = Moving shirts to ironing + Moving shirts to packaging
Move Time = 8 min + 2 min
Move Time = 10 minutes
(d)
Wait time is the time incurred to wait for the next process.
Wait time = Wait time before moving + Wait time before moving
Wait time = 6 min + 4 min
Wait time = 10 min
(e)
Cycle time is the time incurred to complete the manufacturing cycle by a product.
Cycle time = Value added time + Move Time + Inspection time
Cycle time = 36 minutes + 10 minutes + 12 minutes
Cycle time = 58 minutes