Answer:
a. Offered load = 1 lot / 4 hours = 6 cars/4 hours = 1.5 cars/hours
b. Demand rate = Total cars per 4 hours/20 minutes time
Demand rate = 6*4 / 20
Demand rate = 24/20
Demand rate = 1.2 cars/hours
Implied utilization = Demand rate / Offered load
Implied utilization = 1.2/1.5
Implied utilization = 0.8
Implied utilization = 80%
c. Capacity of the process = 1 lot / 5 hours
Capacity of the process = 6 / 5
Capacity of the process = 1.2 rentals per hours
d. Probability that all eight cars are rented at the same time
=> (1 - 0.8) * (0.8)^8
=> 0.2 * 0.1678
=> 0.03356
=> 3.36