116k views
1 vote
Please help ASAP!!

Which type of control system requires engineers to analyze data before any corrective action occurs?

In contrast to automated control systems, a_________
is a type of control system in which engineers must first analyze a system's output and then decide if the system requires any adjustments.

User Tomas By
by
6.4k points

1 Answer

12 votes
I believe a Closed loop
User Sigmalha
by
7.1k points